杨房沟水电站地下厂房开挖施工技术 被引量:1

Excavation Construction Technology of Underground Powerhouse of Yangfanggou Hydroelectric Power Station
下载PDF
导出
摘要 杨房沟水电站是我国首个采用设计施工总承包模式进行建设的百万千瓦级大型水电站,地下厂房施工是工程建设的两大主线之一。针对其花岗闪长岩的特性,采取了地质跟进、动态进行设计施工的方式,确保了工程和开挖施工安全,并提前半年完成了地下厂房开挖的目标,为混凝土转序奠定了坚实的基础。 Yangfanggou Hydroelectric Power Station is the first mega-kilowatt hydroelectric power station in China to be constructed by the general contracting mode of design and construction.The construction of underground powerhouse is one of the two main lines of construction.In view of the characteristics of its granodiorite,the way of geological follow-up and dynamic design and construction is adopted to ensure the safety of engineering and excavation construction,and the excavation goal of underground powerhouse is completed half a year ahead of schedule,which lays a solid foundation for concrete sequencing.
作者 周强 ZHOU Qiang(Sinohydro Bureau 7th Co.,Ltd.,Chengdu,Sichuan 610213,China)
出处 《施工技术》 CAS 2019年第11期116-119,135,共5页 Construction Technology
关键词 水电站 地下厂房 开挖 监测 施工技术 hydroelectric power stations underground powerhouse excavation monitoring construction
  • 相关文献

参考文献6

二级参考文献10

共引文献25

同被引文献8

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部