摘要
针对某化工厂废水处理站总氮超标的问题,通过小试试验,提出解决的可行性方案,期望为该企业及同类废水的处理提供参考意见。
Aiming at the excess total nitrogen content in the wastewater treatment station of a chemical plant, the feasible scheme is put forward through a pilot test, which is expected to provide reference for the plant and treatment of similar wastewater.
出处
《上海化工》
CAS
2017年第9期18-21,共4页
Shanghai Chemical Industry
关键词
化工废水
脱氮工艺
总氮
Chemical industry wastewater
Nitrogen removal process
Total nitrogen