摘要
采用综合注浆法处理地基具有施工速度快、质量高、可先靠性好的特点。本文介绍了湖南国际会展中心采用综合注浆法加固人工挖孔桩的工程实例,可供参考。
When complex grouting method is applied in ground treatment, it has the advantages of shorter construction period, higher construction quality and more reliability. Case history of Hunan International Conference and Exhibition Center in improving man-dig piles by complex grouting method is introduced in this paper. It can provide reference for engineers.
出处
《土工基础》
2003年第3期33-36,共4页
Soil Engineering and Foundation