期刊文献+

项目群施工进度协同控制模式研究 被引量:2

Study on Coordinated Process Control for Project Group Construction
下载PDF
导出
摘要 项目群施工成本高、工期长、风险大,施工中出现的问题繁杂多样,必须对项目群施工进度有效控制。针对项目群控制特征对其特点进行了分析,通过项目群控制流程、项目群进度控制关键技术及项目群具体控制措施三方面内容进行了详细的阐述和分析。依据项目群关键技术,详细研究了项目优先级的确定、工作结构的分解、关键链法项目群进度协同计划的编制和子项目工期优化。项目群施工进度协同控制为更好的实施进度控制提供了一种有效的模式。 Project group has the characteristics of high cost,long duration and high risk.Diverse problems always arise uncertainly during construction,so we must effectively control the construction progress of the project group.This paper analyzes the control characteristics of the project group,the process,the key technology and the detailed measures of schedule control of the project group.The article analyzes the determination of project priorities,work structure decomposition,critical chain projects schedule coordination plan and project duration optimization,followed by a detailed analysis.The implementation of construction progress control of the project group provides an effective model for a better schedule control.
出处 《沈阳建筑大学学报(社会科学版)》 2014年第3期301-305,共5页 Journal of Shenyang Jianzhu University:Social Science
基金 辽宁省高等学校优秀人才支持计划项目(WJQ2011011) 沈阳市科学技术计划项目(F12-276-5-04 F13-317-5-12) 国家软科学研究计划项目(2013GXS4D109) 辽宁省科技计划项目(2011401019)
关键词 项目群 施工进度 计划编制 资源配置 协同控制 project group construction schedule plan formulation resource allocation coordinated control
  • 相关文献

参考文献5

二级参考文献20

共引文献37

同被引文献5

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部