三汊湾船闸加固改造设计 被引量:4

Design of reinforcement and improvement for Sanchawan Ship-lock
下载PDF
导出
摘要 重点介绍了三汊湾船闸加固改造设计中的技术难点,在设计中解决了新老地下连续墙和新老止水的连接、新闸首与老闸室存在最大1.5 m高差、系船设施布置和施工模板等问题,为同类船闸的加固改造提供一个成功的范例。 The technical difficulties in the design of the reinforcement and improvement of Sanchawan Ship-lock are mainly introduced herein,and the problems such as the connection between the new and the old seals for both the new and the old underground continuous concrete cutoff walls,the elevation difference up to 1. 5m between the new and the old lock chambers,the layout of mooring facilities,construction formwork,etc. are solved by this design; which provides a successful case for the reinforcement and improvement of the similar ship-lock.
出处 《水利水电技术》 CSCD 北大核心 2014年第4期80-82,86,共4页 Water Resources and Hydropower Engineering
关键词 三汊湾船闸 地下连续墙 加固改造 设计 Sanchawan Ship-lock underground continuous concrete cutoff wall reinforcement and improvement design
  • 相关文献

参考文献1

二级参考文献1

  • 1.解台船闸闸室墙耐久性及强度检测报告[R].南京:南京水利科学研究院,2002..

共引文献1

同被引文献44

引证文献4

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部