摘要
对梨园水电站施工场内的交通现状进行了分析,基于土石方调配成果,应用相应的评价方法对土石方填筑各期的调配运输情况进行了分析,找出各期相应的危险上坝线路,实现道路交通的系统管理。研究结果对工程施工场内交通安全具有重要意义。
The traffic status in the construction site of Liyuan Hydropower Station is analyzed,and then the transport deployments in all the earthwork construction stages are analyzed with the relevant assessment method on the basis of the result of the earthwork deployment. In this way,not only the corresponding dangerous transport routes during each construction stage are found out,but the systematical management of the traffic in the site is also realized. The study result has an important significance for the traffic safety in the construction site of the project.
出处
《水利水电技术》
CSCD
北大核心
2014年第8期125-126,129,共3页
Water Resources and Hydropower Engineering
基金
国家自然科学基金(51021004
51179121
51209159)
国家重点基础研究发展计划"973"项目(2013CB035904)
关键词
梨园水电站
堆石坝
施工现场交通
安全评价
Liyuan Hydropower Station
rockfill dam
traffic in construction site
safety assessment