PCCP受载响应全过程有限元分析 被引量:5

Finite element analysis on whole process of load-bearing response of PCCP
下载PDF
导出
摘要 基于陕西杨凌供水工程,建立预应力钢筒混凝土管(PCCP)的三维非线性有限元模型,研究了PCCP在全寿命各个阶段的受力特性和结构性能,得到PCCP各阶段应力状态和裂缝开展的规律。分析结果表明:(1)缠丝后由于管芯在预应力作用下的收缩变形,钢丝可能发生4%的预应力损失;(2)在预应力作用下管芯混凝土全截面受压,最大压应力在管道内侧,且由内到外线性递减;(3)在土荷载和管道自重作用下,砂浆层出现裂纹,管道发生椭圆形变形,在内水压力作用下,管道有外扩的趋势。 Based on Yangling Water Supply Project,a 3D nonlinear finite element model of prestressed concrete cylinder pipe(PCCP) is established herein,and then the bearing behavior and structure performance of PCCP at all the phases of its whole life are studied,thus the stress status and the cracking law at all the phases of PCCP are obtained.The analysis shows that:(1) after wiring of the prestressed steel wire,4% prestressing loss of the prestressed steel wire possibly occurs due to the contraction deformation of the pipe core under the prestressing effect;(2) under the prestressing effect,the full section of the pipe core concrete is pressurized along with the maximum compressive stress inside of the pipeline that presents a linear decreasing from the inside to the outside;(3) under the effects of both the soil-load and the self-weight of the pipe,fissures appear on the mortar coating with the oval deformation of the pipe,while the trend of the outward expansion of the pipe occurs under the effect of the internal water pressure.
作者 张宏宇 彭华
出处 《水利水电技术》 CSCD 北大核心 2014年第10期60-64,69,共6页 Water Resources and Hydropower Engineering
关键词 预应力钢筒混凝土管 受载响应 有限元分析 预应力 prestressed concrete cylinder pipe(PCCP) load-bearing response finite element analysis prestress
  • 相关文献

参考文献3

二级参考文献28

共引文献46

同被引文献40

  • 1吕继成,陆俊.引江济淮工程中PCCP管道应用检测与研究[J].中国水运(下半月),2020(3):249-250. 被引量:2
  • 2王五平,Jack Elliott,宋人心,傅翔.PCCP爆管预警的光纤声监测系统[J].水利水电技术,2009,40(3):68-70. 被引量:14
  • 3孙绍平,王贯明,韩扬.预应力钢筒混凝土管(PCCP)耐久性探讨[J].特种结构,2005,22(3):16-20. 被引量:8
  • 4曾焕丽.宽扎河引水工程HDPE管道设计施工技术[J].山西建筑,2007,33(20):196-197. 被引量:4
  • 5FORTNER B. Main line mending [ J ]. Civil Engineering, 1999,69:25-42.
  • 6VALIENTE A. Stress corrosion failure of large diameter pressure pipelines of prestressed concrete [J]. Engineering Failure Analysis,2001(8):245-261.
  • 7NOWAK A,SZERSZEN M. Calibration of design code for buildings (ACI 318) Part I and Part II [J]. ACI Structural Journal, 2003,100(3) : 383-389.
  • 8王五平,JackElliott,宋人心,等.大型调水工程PCCP爆管预警及风险管理技术[c]//中国水利水电勘测设计协会调水工程应用技术交流会论文集,2009:574-578.
  • 9YOU R. Analysis of circumferential cracking due to wire breaks in PCCP [J]. Advanced Materials Research, 2012 2860 2864.
  • 10YONGJEI L J, EUN-TAIK L. Retrofit design of damaged prestressed concrete cylinder pipes [J]. International Journal of Concrete Structures and Materials,2013,7(4) ..265-271.

引证文献5

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部