向家坝水电站7号机组过速试验中接力器异常开启的受力过程分析 被引量:2

Analysis on stress process of servomotor abnormal start-up during over-speed test for No.7 hydropower generating unit of Xiangjiaba Hydropower Station
下载PDF
导出
摘要 向家坝水电站首台7号机组在机械过速试验紧急停机过程中,导叶接力器在关至17%开度左右时,突然异常开启至23%开度左右,然后再按照剩余关机规律关闭至全关,显然整个关机曲线不符合关机规律,无法满足机组安全运行要求。现场决定用试验录波的方法,对导叶接力器在整个关闭过程中的受力情况进行分析,明确受力突变原因,找出解决方法。 During the emergency shut-down of the machinery over-speed test made on the first unit——No. 7 hydropower generating unit of Xiangjiaba Hydropower Station,when the guide vane servomotor shuts down the guide vane to the opening of about17%,the abnormal start-up with the opening of about 23% abruptly occurs,after that,shuts down to the full-closing with the remain shut-down law; for which the whole shut-down curve is obviously not coincide with the law of the shut-down. At the site,it is determined to analyze the stress state during the whole shut-down process of the guide vane servomotor,so as to define the causation of the abrupt change of stress and find out the relevant solving method.
作者 胡忠
出处 《水利水电技术》 CSCD 北大核心 2015年第S1期56-58,61,共4页 Water Resources and Hydropower Engineering
关键词 向家坝水电站 水轮发电机组 过速试验 紧急停机 导叶接力器 Xiangjiaba Hydropower Station hydropower generating unit over-speed test emergency shut-down guide vane servomotor
  • 相关文献

同被引文献18

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部