摘要
大风江调水工程闸址建于河流入海口,又属于跨流域调水工程,涉及生态环境、泥沙淤积、水量和水质变化等较为敏感的环境问题。通过对环境影响的分析,认为工程有利影响是主要而长远的,不利影响采取适当的措施可以得到减免,兴建该工程是可行的。
The lock site of the Dafengjiang water transfer project was laid out in sea outfall and it was an interbasin water transfer project, related to some environment problems of ecology, soil silting and water quantity and quality change, etc. By environment influence analysis, the project was thought feasible which its viable influence is main and longterm and drawback influence can be decreased by adequate measures.
出处
《广西水利水电》
2003年第3期23-25,共3页
Guangxi Water Resources & Hydropower Engineering