期刊文献+

西藏高海拔深切峡谷地区水电设计关键技术问题研究 被引量:3

Research on Key Technical Problems of Hydropower Design in High-altitude Deep Gorge Area of Tibet
下载PDF
导出
摘要 对于在西藏高海拔深切峡谷地区建设水电工程,面临水文气象缺少、地质环境条件多变、工程设计规模巨大、高水头超大机组容量、筑坝建设环境复杂等方面问题。中国电建集团华东勘测设计研究院有限公司投入了极大的努力,结合自身丰富的工程经验,对流域的一些独特水文、地质、水工结构、水轮发电机组、筑坝材料等,开展了一系列的研究工作,积累了大量研究成果。 For the construction of hydropower projects in the high-altitude deep gorge area of Tibet,it is facing some problemswith less hydrometeorology data,variable geological environment condition,huge engineering design scale,super large capacityhydro-generator unit with high water head and complex dam filling environment. Power China Huadong Engineering CorporationLimited has invested a great deal of effort to research the special hydrogeology,geological environment,hydraulic structure,hydro-generator unit and dam filling materials based on its abundant engineering experience in hydropower projects,and a largeamount of research results have been achieved.
作者 侯靖 吴忠 刘宁 赵国斌 李新宇 方杰 HOU Jing;WU Zhong;LIU Ning;ZHAO Guobin;LI Xinyu;FANG Jie(PowerChina Huadong Engineering Corporation Limited,Hangzhou 311122,Zhejiang,China)
出处 《水力发电》 北大核心 2019年第2期14-17,38,共5页 Water Power
关键词 高海拔深切峡谷 工程建设 高水头超大机组 筑坝技术 西藏 high-altitude deep gorge engineering construction super large unit with high head dam filling technique Tibet
  • 相关文献

参考文献4

二级参考文献28

共引文献245

同被引文献62

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部