摘要
结合卡普斯浪二级水电站工程,对水轮机蜗壳外围混凝土进行受力分析、配筋计算和探讨,供同类中、小型水电站参考。
Take the project of the Second Hydropower Station on Kapusilang River for example, the force analysis and reinforcement calculation for concrete structure surrounding the spiral case are dis-cussed in this article, just a reference for similar projects.
出处
《水利科技与经济》
2016年第7期113-115,共3页
Water Conservancy Science and Technology and Economy
关键词
蜗壳
配筋计算
弹性垫层
spiral case
reinforcement calculation
elastic layer