摘要 泥沙问题是三峡工程的关键技术问题之一,在三峡工程论证和初步设计阶段提出水库采取"蓄清排浑"的运用方式,可以解决泥沙问题。2003年水库蓄水运用以来的实践表明,水库基本遵循了"蓄清排浑"调度运用原则,并根据上游来水来沙减少等新情况对水库运用方式进行了优化调整。本文系统分析了三峡水库"蓄清排浑"运行方式及其优化调整的利弊,包括提前5年实施175 m试验性蓄水、汛期水位动态变化、汛末提前蓄水等对水库淤积和坝下游河道演变的影响,提出了进一步优化水库调度方式,形成"蓄清排浑"运用的新模式,保持水库长期使用的建议,试图为三峡水库科学高效安全运用提供科技支撑。 The silt problem is one of the key technical problems in the Three Gorges Project. In the demonstration and preliminary design phases of the Three Gorges Project,adoption of the'storing clean waterand discharging muddy flow'method was proposed for solving the silt problem. The implementation of reser?voir water impoundment in 2003 showed that the reservoir generally follows'storing clean water and dis?charging muddy flow'scheduling principle and its mode of operation is optimized based on new conditionssuch as the reduction of upstream water and silt. This study systematically analyzes the advantages and dis?advantages of optimization and adjustment of'storing clean water and discharging muddy flow'of operationof the Three Gorges Reservoir, including the effects of the 175 m experimental impoundment implementedfive years previously,dynamic changes in water level during the flood season,and effects of advanced wa?ter impoundment,on reservoir sedimentation and river channel evolution downstream of the dam. In orderto providing technical support for the scientific,efficient,and safe utilization of the Three Gorges Reser?voir,optimization suggestions for reservoir scheduling aim at forming a new'storing clean water and discharging muddy flow'model and maintaining long term use of the reservoir are proposed.
作者 胡春宏 方春明 许全喜 HU Chunhong;FANG Chunming;XU Quanxi(State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin,China Institute of Water Resources and Hydropower Research,Beijing 100038,China;Bureau of Hydrology of Changjiang Water Resources Commission,Wuhan 430010,China)
出处 《水利学报》 EI CSCD 北大核心 2019年第1期2-11,共10页 Journal of Hydraulic Engineering
基金 十二五"国家科技支撑计划项目(2012BAB04B02)
关键词 三峡工程 泥沙问题 水库运用方式 蓄清排浑 优化调度 Three Gorges Project silt problem reservoir scheduling storing clean water and discharging muddy flow optimal scheduling
  • 相关文献

参考文献4

二级参考文献28

  • 1李义天,甘富万,邓金运.三峡水库9月分旬控制蓄水初步研究[J].水力发电学报,2006,25(1):61-66. 被引量:44
  • 2Pan Liu, Sheng Lianguo, Wei Li. Optimal design of seasonal flood con- trol water levels for the Three Gorges Reservoir [ C ] // Hydrological Sciences for Managing Water Resources in the Asian Developing World. IAHS Publication,2008, (319) :270 - 279.
  • 3曹广晶,蔡治国.三峡水利枢纽综合调度管理研究与实践[J].人民长江,2008,39(2):1-4. 被引量:16
  • 4黄河水利委员会科技外事局,专门峡水利枢纽管理局编.三门峡水利枢纽运用四十周年论文[M].郑州:黄河水利出版社,2001.
  • 5刘继祥.水库运用厅式与实践[M].北京:中国水利水电出版社,2008.
  • 6刘继祥.水库运用厅式与实践[M].北京:郑州:黄河水利出版社,2008.
  • 7长江三峡工程泥沙专家组.长江三峡工程泥沙专题论证报告[R].1988.
  • 8涂肩华,扬赉斐.泥沙设计手册[M].北京:中国水利水电出版社,2006.
  • 9武汉水利电力学院河流泥沙工程学教研室.河流泥沙工程学(下册)[M].北京:水利出版社,1981.
  • 10黄河勘测规划设计有限公司.小浪底水库拦沙期防洪减淤运用方式研究[R].2012.

共引文献88

同被引文献363

引证文献22

二级引证文献123

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部