摘要
通过施工投入、效率、安全、质量、环水保五方面对湿陷性黄土隧道浅埋偏压段隧道施工和隧道调整为明挖路基施工两种施工方案进行对比分析,从而了解各施工方案的利弊,作为后期类似相关施工问题的参考。
Through the construction of the input, the efficiency, the safety, the quality and the water conservation, the tunnel construction and the tunnel adjustment of the collapsible loess tunnel are divided into two kinds of construction schemes, so as to understand the construction scheme Pros and cons, as a reference for later similar construction problems.