工程成本控制是监督成本费用,降低工程造价的重要手段.在计划管理中采用网络计划技术,就是把施工过程中的各有关工作组成一个有机整体,全面而明确地反映出每一工序目标与所需条件之间,以及各项工序之间的相互制约和相互依赖关系.网络计划的实施,需要各种条件的支持.一个工期符合规定,资源需求均衡,费用合理的方案,是对网络计划进行优化后实现的.
Engineering cost control is an important means to supervise the cost expenditure and lower the construction cost.The adoption of the cyber plan technique in the planned management will enable all the work in the construction process to form an organic whole and reflect the mutual restriction and relations between each procedural goal and the conditions required and between each procedure.The implementation of the cyber plan needs the support of various conditions.Unless the cyber plan is optimized,the project cannot be fulfilled which is rational in expenditure and eligible for the construction period and has a balanced demand-and-supply of resources.