期刊文献+

苏制215MW机组调峰运行问题探讨

Zhangze Electric Power 215 MW Capacity Optimal Adjust Peak Method
下载PDF
导出
摘要 针对我国目前大容量机组的投产和小容量机组的关停,漳泽发电厂由原来的基荷电厂改为调峰电厂。为适应网间潮流要求,机组运行工况发生了很大变化,产生了许多问题。着重对苏制215MW燃煤机组在网间潮流调峰过程中如何选择最佳调峰方式,使变负荷调峰的参数达到优化、运行方式进行了较深入的分析,结合电网情况,确定了最佳调峰运行方式,对机组出现的若干问题给出了有建设性的结论。 Due to the production of the mass capacity motor and the breakdown and suspend of the less capacity motor at present in China,Zhangze Power Plant has changed over from basic power plant to adjustpeak power plant.In order to adapt the demand for the prevalence of network,the great change has been taken place for the motor function,which caused lots of problems.Combined with electrical network,the article focused on deep analysis about how to choose the best way of adjustpeak in the process of network prevalence adjustpeak,which can optimize the parameter of capacity turned adjustpeak.The article not only confirms the best way of adjustpeak function,but gives the constructive conclusion of those problems caused by unit.
作者 赵超
出处 《山西电力》 2003年第A01期17-19,38,共4页 Shanxi Electric Power
关键词 苏制215MW机组 调峰运行 汽轮发电机组 变负荷速率 tidal current between network adjust-peak method parameter of changing-load adjust peak speed of changing load
  • 相关文献

参考文献3

二级参考文献2

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部