摘要
对韶关发电厂8号机大修后启动过程中轴承振动及带负荷后出现的轴承振动进行监测、诊断,找出轴承振动故障原因,并制定相应对策,解决了发电机转子临界转速下轴承振动大的问题以及机组带负荷后2号、3号轴承出现的半速涡动问题,大大提高了机组运行的安全性。
By monitoring and diagnosing the bearing vibration during startup and onload operation of overhauled Unit 8 in Shaoguan Power Plant,the cause of the vibration is clarified and corresponding countermeasures formulated,thus eliminating unacceptable bearing vibration at generator rotor whirling speed and the halfspeed vortex on No2 and No3 bearings during onload operation of the unit,and greatly enhancing the safety of the unit.
出处
《广东电力》
2003年第4期69-72,78,共5页
Guangdong Electric Power