摘要
主要介绍了安装在秦山核电站的我国自行设计自行建造的第一台31万千瓦压水堆型核电汽轮机运行情况,文中结合机组在投运后大修中的几项改进工作进行简要阐述,为今后核电汽轮机设计制造提供宝贵的经验。
The operational condition of 310MW pressurized water reactor type nuclear steam turbine installed in Qinshan Power Station is mainly introduced in this paper, which describes several improvements made during the overhaul time after more than ten year`s operation and gives a valuable experience for the further design and manufacture of nuclear steam turbine.
出处
《热力透平》
2003年第3期191-193,共3页
Thermal Turbine
关键词
核电站
调试
顶轴油系统
润滑油系统
管道布置
汽轮机
nuclear power station
adjustment
jacking oil system
lubricating system
piping arrangement