摘要
由于外界条件的变化与差异 ,泵站的实际运行工况总是或多或少地偏离设计最佳工况。本文根据攀钢高炉循环水泵站运行情况 ,对该泵站净环泵组及水泵的运行进行了电耗和效率的分析 。
Because of the change and difference of external condition,practical operating mode of pumping station always deviates from the design's more or less.Based on the operating mode of blast furnace recycle water pumping station in Pangang,this paper analyzed the electric consumption and efficiency of decontaminating pump units and water pump.Also the measures of energy saving were discussed.
出处
《冶金能源》
北大核心
2003年第5期58-60,共3页
Energy For Metallurgical Industry