摘要
在对原RSM法研究的基础上 ,提出了一种多资源约束下改进的RSM法 ,并介绍了其决策原理和计算步骤。该法对原RSM法进行了改进 ,优化计算时能相对减少计算量 ,通过案例可以证明该法能取得满意的效果。
Based on the research of the RSM method, this article puts forward the improved RSM method and introduces the rationale of decision making and the calculation process of the method. It modifies the original RSM and optimizes the calculation time to reduce the amount of calculation, and can achieve satisfactory results evidenced by examples
出处
《铁路工程造价管理》
2003年第5期30-32,共3页
Railway Engineering Cost Management