西北电网实时动态监控系统发展前景分析

Prospect Forecasting of Real-time DynamicMonitoring and Control System in NorthwestElectric Power Grid
下载PDF
导出
摘要 介绍了西北电网实时动态监控系统建设和西北电网扰动试验概况。正在建设的西北电网实时动态监控系统一期工程——广域相量测量系统WAMS(Wide Area Measurement System)全面地记录了本次扰动试验的各项数据。试验结果检验了WAMS系统各项应用功能,表明西北电网实时动态监控系统建设初见成效,发展前景光明。 Tbe construction of real-time Dynamic monitoring and control system and the general situation of disturbance test in Northwest Grid are presented. The first-stage project of Northwest Grid Real-time Dynamic Monitoring and Control System-WAMS (Wide Area Measurement System), which is under construction at present, records the test data of the disturbance test completely. The application functions of the system have been tested already. The test results has shown that the construction of Northwest Grid Real- time Dynamic Monitoring and Control System is successful with prospective developing future.
作者 史可琴 高鑫
出处 《电网与水力发电进展》 2007年第2期9-12,共4页
关键词 实时动态监控系统 广域相量测量系统 扰动试验 real-time dynamic monitoring and control system wide area measurement system disturbance test
  • 相关文献

参考文献3

二级参考文献28

共引文献104

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部