期刊文献+

黄河上游梯级水电站调度与水量综合利用 被引量:6

Dispatch and Comprehensive Utilization of Water Volume in Yellow River’s Upstream Cascade Hydroelectric Power Station
下载PDF
导出
摘要 根据黄河上游梯级水电站特点,面对梯级水电站发电、防洪、防凌、灌溉等综合利用的矛盾,对如何充分发挥黄河上游梯级水电站联合调度,化解各种矛盾,提高综合利用效益从不同的调度期进行了论述,期望能对同类梯级水电站运行起到借鉴。 According to the characteristics of the Yellow River upstream cascade hydroelectric power station and the contradiction existed in comprehensive utilization of hydroelectric power station electricity generation,flood prevention,guarding against ice-run and irrigation contradiction,how to fully display the union dispatch of Yellow River upstream cascade hydroelectric power station to dispose the contradiction and enhance the comprehensive utilization benefit is discussed in the different dispatch time.It is expected to supply reference to the operation of the similar cascade hydroelectric power station.
作者 乔秋文
机构地区 西北电网公司
出处 《电网与水力发电进展》 2007年第A03期51-54,共4页
关键词 梯级水电站 调度 综合利用 cascade hydroelectric power station dispatch comprehensive utilization
  • 相关文献

参考文献3

二级参考文献2

  • 1王敬国主编.资源与环境概论[M].中国农业大学出版社,2002..
  • 2任海 彭少麟编著.恢复生态学导论[M].北京:科学出版社,2002.1-144.

共引文献76

同被引文献62

引证文献6

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部