摘要
结合已建工程的成功经验,根据工程实际情况,研究了烟岗水电站首部枢纽"以库代池"方案和沉沙池方案,根据经济技术比较,以及对需要功能的实现结果综合分析,综合论证,阐明了"以库代池"方案的可行性和优越性,为以后同类水电站的设计研究有借鉴作用。
According to the successful experience and practical situation of the project,the scheme of using reservoir instead of desilting tank in Yangang reservoir is studied.The feasibility and advantages of the scheme is presented through economical and technical comparison and result comprehensive analysis of the required function.
关键词
高水头电站
防沙
以库代池
研究
hydropower station with high water head
sediment prevention
using reservoir instead of desilting tank
study