摘要
以新疆塔什库尔干河下游梯级水电规划工程为例,详细介绍了测量基本控制的技术设计和实施验证效果,为类似工程测量提供可借鉴的经验。
The planning of cascade hydropower stations in lower reaches of Tashikuergan River is introduced with the emphasis on design and implementation of control basic survey.It is expected to supply reference for the other similar projects.
关键词
梯级水电
测量
基本控制
设计
cascade hydropower stations
survey
basic control
design