摘要
宝石引水式电站最大库容23.1万m3,电站装机容量600 kW,枢纽工程包括拦河坝、进水闸、输水洞、压力前池、发电厂房、尾水渠、升压站及联网线路。本文对该电站的主体工程施工进行了设计分析,包括基础开挖、坝基帷幕灌浆施工、混凝土施工、拦河坝施工、输水洞施工、进水闸与压力前池施工、压力管施工、发电厂房施工、漫水桥施工、金属结构设备和机电设备施工以及升压站施工。宝石引水式电站的建成能够增加当地的电力供应,缓解电力紧张的矛盾,并且可利用库区水面发展水产养殖业和旅游业,培育新的经济增长点,促进当地经济发展,加快新农村建设步伐。
The gemstone diversion power station has a maximum storage capacity of 231,000 m3 and a power plant installed capacity of 600 kW. The hub projects include barrage, intake gates, water delivery tunnels, pressure front pools,power plant houses, tail water channels, booster stations and networking lines. In this paper, the design and analysis of the main construction of the power station are carried out, including foundation excavation, dam foundation curtain grouting construction, concrete construction, barrage construction, water transfer tunnel construction, intake gate and pressure front pool construction, pressure pipe construction, power plant construction, Construction of flood bridges, construction of metal structure equipment and electromechanical equipment, and construction of booster stations. The completion of the gem water diversion power station can increase the local power supply, alleviate the contradiction of power shortage, and use the water surface of the reservoir area to develop aquaculture and tourism, foster new economic growth points, promote local economic development, and accelerate the pace of new rural construction.
作者
安运涛
An Yuntao(DandongWater Resources Survey and Design Institute Dandong 118000,Liaoning)
出处
《陕西水利》
2019年第1期131-133,共3页
Shaanxi Water Resources
关键词
引水式电站
施工
设计
Diversion power station
the construction and to design