摘要
介绍了高桥石化公司热电厂为适应浦东新区未来环保的要求而进行的烟气脱硫方案及其准备工作 ,分析了电厂进行烟气脱硫的必要性和紧迫性 ,针对现有条件 ,选择了一种能满足长远发展规划、各项运行指标较先进的湿式石灰石 (石灰 )
In order to conform the environmental requirement of Putong New District, the FGD plan and its preparation work of Gaoqiao Cogeneration Power Station under the Gaoqiao Petrolem Chemical Co. are decribed. The neccesity and urgency of FGS for the Plant are analysed. According to the existed condition, the wet lime gypsium desulfurization technology, which is a matured FGD technology and also will satisfy the puropse of long term developing program is finally seccted.
出处
《华东电力》
北大核心
2002年第8期12-13,共2页
East China Electric Power
关键词
热电厂
烟气脱硫工艺
二氧化硫
脱硫效率
中小型老电站
old power station
flue gas desulfurization(FGD)
lime gypsium desulfurization process