公路施工边桩控制测量方法 被引量:1

The Side Stake Control Measure Method in the Highway Construction
下载PDF
导出
摘要 公路工程施工中 ,公路线形一般由中桩控制 ,公路宽度是用钢尺自中桩向两侧丈量。由于人工掌握路线 ,竖直方向容易产生误差 ,进而引起公路线形和宽度有误差 ;同时施工中中桩常受到机械破坏 ,造成重复测量 ,增加工作量。为此 ,采用边桩控制路形和施工的计算公式、放样方法 ,通过实际应用 ,证明该方法测量速度快、精度高、提高施工效率 ,适用于高等级公路施工测量。 In the construction of the highway project, the highway line is generally controlled by the middle stakes and the width of highway is measured with a steel ruler from the middle stakes to both sides. Because the line is controlled by persons, errors are easily produced in the vertical direction, causing errors of the highway line and width. The middle stakes are destroyed by equipment during the construction, causing repeated measures and increasing work amount. So it is necessary to adopt the side stake control method and calculation formula and lofting method. The practical uses prove that using such methods have the advantages of fast measure with high accuracy and improvement of work efficiency. They are suitable for measure in the construction of high-class highways.
作者 崔俊英
出处 《新余高专学报》 2003年第2期48-51,共4页 Journal of XinYu College
关键词 公路线形 边桩 基准点 测量 坐标 Highway line Side Stakes Datum point Measure Coordinate
  • 相关文献

参考文献2

  • 1交通部第一公路工程局.公路施工手册:桥涵[Z].北京:人民交通出版社,1993..
  • 2王真.公路工程施工要点与通病处理大全[M].北京:兵器工业出版社,2001..

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部