百色水电站进水口布置于软硬相间的D3l1~D3l3多种水成岩地层上,地质复杂,条件不很理想,技施阶段在不改变原建筑物布置情况下,对高边坡稳定及进水塔软弱地基进行处理,采取了有异于常规的设计思想及工程措施。经综合分析,结果表明边坡及塔基处理经济、合理。
Water intake of Baise project is laid on the strata composed of sedimentary rocks from D3L1 to D3L3 with complicated geological conditions. Considering the unfavorable construction conditions, unusual design ideas and treatment measures are taken in construction design to ensure the stability of the high slope and strengthen the weak tower foundation. The comprehensive analysis proves the economy and rationality of the design ideas and measures.
出处
《红水河》
2003年第3期23-27,共5页
Hongshui River
关键词
高边坡
软弱地基
百色水电站
进水口
水塔
稳定
high slope
weak foundation
engineering measures
intake of the power station
Baise project