工程项目进度计划优化方法的研究 被引量:28

Study on the Project Schedule Optimization Method
下载PDF
导出
摘要 网络计划技术是当前工程项目进行进度安排与控制时普遍采用的一种方法,但网络的工期 成本优化问题至今没有得到很好的解决.该文根据"最大流最小截"理论,针对多年来难以解决的工期 成本优化问题提出了解决方法,并通过一个简单的单代号网络例题说明其优化步骤和数学模型,使工期 成本优化很容易在计算机上实现.该方法对控制工程进度、降低工程成本具有积极意义. The network technology is a popular me th od for construction schedule and control. But till now there has not been a sati sfied solution to the problem of construction duration-cost optimization. This paper presents an innovative technique that can be used to optimize the time-co st trade-off process. The technique is based on the theory of Maximum Flow-Min imal Cut(MFMC).In the paper a simple PDM network example is used to describe the optimization process and mathematics model. It makes the availability of time- cost optimization method on computer. The method is of a great significance to c ontrolling construction schedule and reducing costs.
作者 刘津明
出处 《天津大学学报(自然科学与工程技术版)》 EI CAS CSCD 北大核心 2003年第5期610-613,共4页 Journal of Tianjin University:Science and Technology
关键词 工程项目 进度安排 进度控制 网络计划 工期-成本优化 最小压缩截集 最大流最小截理论 project construction period constructi on costs minimum cut set theory of Maximal Flow and Minimal Cut
  • 相关文献

参考文献2

  • 1翁龙年 亢耀先.运筹学[M].北京:人民邮电出版社,1998..
  • 2Lawrence Bennett F, Lu Ming, Simjaan AbouRizk. Implified CPM/PERT simulation mode [ J ]. Journal of Construction Engineering and Management,2001 ( 11 ) :513-515.

同被引文献123

引证文献28

二级引证文献120

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部