摘要
通过选择压实设备来提高填石路基施工质量 ,探讨了施工过程中压实机具、铺层厚度、碾压遍数及沉降量等因素的相互关系以及影响填石路基施工质量的主要因素 ,为合理有效的填石路基压实工艺提供了依据。
The interrelation of such factors on construction quality as compaction equipment,paving thickness,rolling numbers,sedimentation and etc.and main factors influencing construction of roadbed filied with stone are discussed in this paper.This paper gives the references for compaction techniques of roadbedfilledwithstone.
出处
《筑路机械与施工机械化》
2003年第5期8-9,共2页
Road Machinery & Construction Mechanization