摘要
随着船舶科技含量的提高,船上的船员不断精简。如何能在人员减少的情况下,完成原来高强度的工作,成为船员所面临的一个很现实的问题。扫舱工作就是一项高强度的工作,而且,这项工作需要多人一起完成。把“撇缆活结”应用到这一工作中,会大大减低工作强度,能在人员减少的情况下,很好地完成扫舱工作。
While the technology is developed on board the ship, the manning is decreased rapidly. How to deal with the problem of the hard works on board becomes presently. Cleaning holds is a hard work that needs many crewmembers. 揌eaving line slip knot?could be used in this work, and decrease the working intensity with fewer crewmembers.
出处
《世界海运》
2003年第5期7-8,共2页
World Shipping