通过介绍菏日复线三孔连续顶进桥施工,论述了在复杂地质条件下,大跨度、多孔顶进桥施工工艺及线路加固和防护技术。
In this article, the author introduces the jacking construction of a threespans continuous railway bridge of the Heri doublelines railway, and states construction techniques, strengthening methods and protection technologies of largespan and multispans jacking bridges under complex geological conditions.