一种面向成本优化的生产计划调度算法 被引量:7

A Production Scheduling Algorithm for Cost Optimization
下载PDF
导出
摘要 建立了一种车间层的生产计划的成本优化模型,该模型是一个在时间约束、可重复使用和不可重复使用资源约束下的多模式项目调度问题;给出了解的定义,设计了一种时间可行的成本优化调度算法,通过改进成本优化调度算法达到时间-成本双优的目的;给出了模拟试验结果。 A cost optimization model for production scheduling is built, which is a multi-mode project scheduling problem subject to the constraints of time, renewable resources and nonrenewable resources. The definitions of the solutions are proposed, and a scheduling algorithm for time feasible cost optimization is developed, which is furthermore updated for time-cost optimization. At last, the experimental simulation results are given.
出处 《计算机集成制造系统-CIMS》 EI CSCD 北大核心 2003年第9期735-739,共5页
基金 国家863/CIMS主题资助项目(2001AA414010) 国家"十五"科技攻关计划资助项目(2001BA201A03)。~~
关键词 生产计划 项目调度 成本优化 启发式算法 production scheduling project scheduling cost optimization heuristic algorithm
  • 相关文献

参考文献8

  • 1NUDTASOMBOON N, RANDHAWA S U. Resource-constrained project scheduling with renewable and non- renewable resources and time-resource tradeoffs[J]. Computers Industrial Engineering, 1997, 32(1): 227-242.
  • 2DE REYCK B, HERROELEN W. A branch-and- bound procedure for the resource - constrained project scheduling problem with generalized precedence relations [J]. European Journal of Operational Research, 2000, 111 (1): 152 - 174.
  • 3BRUCKER P, DREXL A, et al. Resource-constrained project scheduling: notation, classification, models, and methods[J]. European Journal of Operational Research, 1999, 112(1): 3-41.
  • 4PHILIPPE B, CLAUDE LE P. Constraint propagation and decomposition techniques for highly disjunctive and highly cumulative project scheduling problems[J]. Constraints, 2000, 5(1/2),119-139.
  • 5ODDI A, SMITH S F. A constraint-based method for project scheduling with time windows[J]. Journal of Heuristics,2002, 8(1):109-136.
  • 6FRANCK B, NEUMANN K, SCHWINDT C. Truncated branch-and-bound, schedule-construction, and schedule - improvement procedures for resource- constrained project scheduling[J]. OR-Spektrum, 2001, 23(3): 297-324.
  • 7KOLISH R. Serial and parallel resource-constrained project scheduling methods revisited: theory and computation[J]. European Journal of Operational Research, 1996, 90 : 320- 333.
  • 8HARTMANN S. Project scheduling with multiple modes: a genetic algorithm[J]. Annals of Operations Research, 2001,102(1-4): 111-135.

同被引文献56

引证文献7

二级引证文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部