摘要
大体积防水混凝土冬期施工,控制混凝土的内外温差和温度变化而造成的裂缝,提高混凝土的抗裂、抗渗性能是施工中的关键.施工时必须在技术上采取综合措施.
It is the key to control the crevasse of the concrete due to the changing of the concrete temperature from internal to external and improve the concrete feature s of resistant crevasse and infiltration during the construction of big volume w aterproof concrete in winter.It is necessary to take technical ways during const ruction.
作者
赵爱喜
郭兵
ZHAO Ai-xi,GUO Bin (1.Henan and Construction Company,Xinxiang 453000, China;2.Pingyuan University,Xinxiang,453003, China)
出处
《平原大学学报》
2003年第2期12-13,共2页
Journal of Pingyuan University