青藏高原多年冻土区通信直埋光缆线路工程的施工初探 被引量:1

Constructing of the Communication Optical Cable Buried Directly in Permafrost Regions of the Tibetan Plateau
下载PDF
导出
摘要 从施工组织、径路选择、敷设、防护等几方面,对高原多年冻土区通信直埋光缆线路工程的施工方法、施工注意事项、施工要求做了简明扼要介绍,对青藏铁路通信光缆线路工程的施工具有指导意义,对保证通信工程的质量、保证行车安全具有重要意义。 the working methods, the procedures, to which a special attention should be paid, and the working requirement in the constructing of the communication optical cable buried directly in permafrost regions of the plateau are described, including working organization, line choosing, cable laying and protecting, etc. This paper has a guiding meaning for the construction of communication optical cable line, and has an important significant for construction quality and operation safety.
作者 骆友曾
出处 《冰川冻土》 CSCD 北大核心 2003年第B08期174-176,共3页 Journal of Glaciology and Geocryology
关键词 青藏高原 冻土区 通信 光缆 线路工程 施工 直埋 Qinghai-Tibet Railway communication optical cable constructing