摘要
从基坑支护的两种方案入手,并对其中桩锚支护体系的设计、加固及施工进行了详细的论述,对基坑支护过程中出现的问题采取了有效的应对措施,通过具体案例分析,提出了基坑支护"动态"设计的概念,为类似工程应用提供参考。
Several pit retaining technologies are reviewed briefly, then the pile-anchorgae procedure is studied in detail. A case study is given with the concept of 'dynamic designing', which may be used as a reference for similar project.
出处
《平顶山工学院学报》
2003年第2期68-70,共3页
Journal of Pingdingshan Institute of Technology