摘要
通过统计资料得出小型水电站存在实际发电量小于设计发电量的现象 ,指出电站枯水历时及流量对水电站发电量的影响 ,提出机组单机容量优化配置的重要性 。
Through statistical data analysis, the phenome no n that the actual power generation is smaller than that of designed is deduced. It is pointed out that the lasting time and discharge of low water period affect the power generation of hydropower plant, and the importance of optimal colloca ting of single dynamo capacity of power generating set is presented. And, method of application of Linear Programming principle in the optimal collocation of si ngle dynamo is introduced.
出处
《中国农村水利水电》
北大核心
2003年第10期18-20,共3页
China Rural Water and Hydropower