摘要
云南澜沧江流域水电开发实行"业主负责、建管结合、产权明晰、流域开发、滚动发展"的机制。水电滚动开发的实质是资本的滚动,目标是根据市场需要,以母体电站为基础,不断扩大流域开发规模,壮大开发实力,实现连续开发。运用系统观点和方法指导梯级水电的建设和经营管理,提出了抓好"母体"电站经营、在建项目管理、加强环境保护,以及争取金融、投资和税收等方面国家优惠政策的对策措施及政策建议。
The hydropower development of the Lancang River Basin in Yunnan Province adopts the mechanism of 'being responsible by the Owner, combining construction with management, clear property right, developing in a river basin and rolling development' The nature of hydropower development is the capital rolling, with the purposes of taking the parent project as a base so as to expand the scale of river basin development, to strengthen its development capabilities and to achieve consecutive development goal, according to the market demands This article delivers the systematic viewpoints and methods to guide the construction and management of cascade hydropower projects; and gives useful suggestions on good management of 'parent' hydropower units, underconstruction project management, strengthening environmental protection, and provides some countermeasures and strategic advices on competing for those State's preferential policies on finance, investment and taxation, etc
出处
《水力发电》
北大核心
2003年第9期5-6,26,共3页
Water Power