拉浪水电站弧形钢闸门检测计算及粘钢加固 被引量:2

Test, calculation and reinforcement of the steel arch-gate of Lalang Hydropower Station
下载PDF
导出
摘要 拉浪水电站溢流坝段露顶弧形钢闸门的主梁、纵隔板、支臂的应力值都超过了允许应力,需要加固处理。加固方案采用"点焊灌胶粘钢法"。该方法是先在粘贴的钢板周边与原钢板点焊,并用YZJ 1结构胶密封,预设灌胶嘴及排气孔,然后用0 3MPa的压力向粘钢与原钢板之间预留的1~2mm的间缝中灌注YZJ 3胶,待72h固化即可受力使用。新老钢板粘结密实度达100%,加固后实测应力降幅都在50%左右,满足了应力要求。"点焊灌胶粘钢法"是一创新,通过在拉浪水电站弧门加固的大量实测结果证明,该方法可靠并可保持结构不变形。 The stresses in the main beam, longitudinal partition board and arm of steel archgate for the overflow dam of Lalang Hydropower Station all surpass their allowance value, so they must be reinforced The method of point solderstick steel plate is adopted in the reinforcement, that is, first soldering steel plate with the original steel boundary, then using glue YZJ1 to seal and injecting YZJ3 glue with 03MPa Through the test, this reinforcement method is credibility and can ensure nondistortion of structure
出处 《水力发电》 北大核心 2003年第9期48-50,61,共4页 Water Power
关键词 弧形钢闸门 检测 计算 粘钢加固 拉浪水电站 steel arch-gate, structure reinforcement, point solder and stick steel plate, Lalang Hydropower Station
  • 相关文献

同被引文献6

  • 1长江水利委员会长江勘测设计研究院.江西省铜鼓县大墩水库除险加固工程初步设计报告[R].武汉:长江水利委员会长江勘测设计研究院,2010.
  • 2长江水利委员会长江勘测设计研究院.安徽省安庆市花凉亭水库除险加固工程初步设计报告[R].武汉:长江水利委员会长江勘测设计研究院.2008.
  • 3侯发亮.建筑结构粘结加固的理论与实践[M].武汉:武汉大学出版社,2006:49—81.
  • 4SL74-2013水利水电工程钢闸门设计规范[S].
  • 5王远旺.朱庄水库泄洪洞进口封堵闸门的设计与安装[J].水科学与工程技术,2011(5):41-43. 被引量:5
  • 6王远旺.粘钢技术在溢流坝弧形闸门加固中的应用[J].水科学与工程技术,2013(1):44-46. 被引量:1

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部