摘要
以采取水、陆联合运输方式运送2×600MW工程发电机定子为例,介绍了采用水、陆联合运输方式运送大型设备的全过程,并探讨了一些注意事项和存在的主要问题。
Through the example of the combined transportation by land and water to transport 2?00MW engineering generator stator, this paper illustrate the whole process of combined transportation way by land and water, discuss the existing major problems and matters needing attention.