摘要
根据公路隧道"新奥法"施工的需要,通过光面爆破试验,得出各种围岩的科学合理的光面爆破设计参数,形成了公路隧道开挖的光面爆破方案,提出了光面爆破的施工工序。控制欠超挖,确保初期支护和二衬厚度,降低工程成本,取得良好的效果。
According to the requirements for road and tunnel construction of 'Xin Ao fa',with the experiments of blast for smooth surface, we have gained lots of scientific and reasonable parameters on the design and construction, formed the scheme in road and tunnel construction, raised the constructional working procedure. And we have also obtained sound effects in controlling under super-excavate, ensuring the thickness of the first and the second supporting and reducing costs of the engineering project.\;
出处
《丽水师范专科学校学报》
2003年第5期77-78,95,共3页
Journal of Lishui Teachers College