风积沙地层隧道长管棚施工技术研究 被引量:2

Research on the Long Tunnel Pipe Roof Construction Technology in Aeolian Sand Strata
下载PDF
导出
摘要 风积沙地层洞口段防止塌方是施工中的重点和难点,而超前大管棚施工是预防塌方最有效的措施。结合工程实践,通过对大管棚施工机具和施工方法的改进,经济有效地解决了在风积沙地质条件下施工大管棚时钻机易扎头、孔壁易坍塌、孔内沙土不易清理等多种难题。 The collapse prevention in portal section is the key and difficulty technology in the construction in aeolian sand formations,while the advanced big pipe construction is the most effective measure to prevent collapse. Based on the engineering practice,the improvement of shed construction equipment and construction method,cost-effective solution was found to the difficulties of easy head rig,easy hole wall collapse,difficulty in the cleaning up of sand in hole in the construction of large pipe roof in geological conditions of aeolian sand,and other problems.
作者 高明星
出处 《铁道建筑技术》 2015年第3期11-13,共3页 Railway Construction Technology
基金 中国铁建股份有限公司科技研究开发计划项目(08-22C)
关键词 风积沙地层 管棚 隧道工程 aeolian sand formations pipe roof tunnel engineering
  • 相关文献

参考文献3

二级参考文献6

共引文献21

同被引文献12

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部