摘要 根据类似项目和当地污水处理厂(再生水厂)的建设、运行经验,结合实际进出水水质特点、占地面积等,在保证出水水质稳定达标的前提下,对原工艺流程及方案进行优化和调整,确保生产工艺流程合理、运行稳定、运营维护管理方便、运行成本可控、应对不同水质工艺调整灵活性强等,为污水处理厂(再生水厂)稳定运行及节能降耗奠定一定的基础。 According to the construction and operation experiences of similar projects and the local sewage water treatment plant (water recycling plant),and combined with the characteristics of actual water inlet and outlet,space for plant and so on,the original technological process and scheme are optimized and adjusted on the basis of ensuring the stability and standards of water quality,thus we can ensure the production technological process is reasonable and the system running is stable,the operation and maintenance are convenient to manage,the operation cost is controllable,and it is flexible to tackle technological process adjustment under different water quality etc.,which can lay a certain foundation for the stable operation and energy saving of sewage treatment plant (water recycling plant).
作者 赵文莉
出处 《铁道建筑技术》 2015年第6期121-123,共3页 Railway Construction Technology
关键词 新建再生水厂 工艺设计 方案优化 newly-built water recycling plant technological process design scheme optimization
  • 相关文献

参考文献6

二级参考文献7

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部