摘要 为解决隧道内水平深层旋喷桩施作精度低等不足,在上白隧道施工中克服了地质钻机改装成水平旋喷钻机的缺点,自行设计并成功研制了拱形导向架程控液压旋喷钻机,该钻机能一次成桩,即钻进成孔和后退旋喷过程钻杆不需要拆换;提高了施工效率,减少了返浆率,降低了水泥用量,提升了深层水平旋喷桩施作精度,基本解决了国内现有水平深层旋喷施作精度低及成桩质量差等问题,值得类似工程借鉴。 In order to solve the problems during the construction of horizontal jet grouting pile in the tunnel,such as low accuracy and so on,in the construction of Shangbai Tunnel,the defects on the horizontal jet grouting drilling rig which has been modified from a geological drilling rig have been overcomed,and an arched guide frame program-controlled jet grou-ting drilling rig has been designed and manufactured accordingly.This drilling rig can finish piling in one shot,that is, there is no need to remove and change the drilling rod while a hole is formed when it drills in and jet grouting when it draws back.In this way,the construction efficiency is improved,the mortar return rate is lower,the cement volume is reduced and the construction accuracy of deep horizontal jet grouting pile is promoted.As a solution to the present problems of low accuracy and poor piling quality in domestic horizontal deep jet grouting pile construction,it is worthwhile using for refer-ences in the similar projects.
作者 李建军
出处 《铁道建筑技术》 2015年第7期11-15,共5页 Railway Construction Technology
关键词 水平深层旋喷桩 一次成桩 拱形导向架 程控液压旋喷钻机 隧道 horizontal deep jet grouting pile piling in one shot arched guide frame program-controlled hydraulic jet grout drilling rig tunnel
  • 相关文献

参考文献2

二级参考文献17

  • 1王正松,孙铁成,高波.全断面预加固隧道施工工法(新意法)[J].铁道标准设计,2007,27(z1):170-173. 被引量:24
  • 2肖广智,魏祥龙.意大利岩土控制变形(ADECO-RS)工法简介[J].现代隧道技术,2007,44(3):11-15. 被引量:31
  • 3Pietro Lunardi. The Design and Construction of Tunnels Using the Approach based on the Analysis of Controlled Deformation in Rocks and Soils[J].Tunnels & Tunneling International ADECO-RS Approach,2000,(05):3-30.
  • 4Pietro Lunardi,R.Bindi. The Evolution of Reinforcement of the Advance Core Using Fibre Glass Elements for Short and Long Term Stability of Tunnels under Difficult Stress-strain Conditions:Design,Technologies and Operating Methods[A].Bologna:Patron Editore,2001.
  • 5Pietro Lunardi. The ADECO-RS Approach in the Design and Construction of the Rome to Naples High Speed Railway Line:A Comparison between Final Design Specifications,Construction Design and "As-built"[A].Bologna:Patron Editore,2001.
  • 6Pietro Lunardi,C.Silva,A.Focracci. The Bologna to Florence High Speed Railway Line:92 km through the Appennines[A].Bologna:Patron Editore,2001.
  • 7P.Gattinoni,M.Pap ini,L.Scesi. Geologic Risk in Underground Works[A].Bologna:Patron Editore,2001.
  • 8翟进营,杨会军,王莉莉.新意法隧道设计施工概述[J].隧道建设,2008,28(1):46-50. 被引量:30
  • 9翟进营,杨会军,王莉莉.“新意法”在国外隧道工程中的应用[J].隧道建设,2008,28(4):469-475. 被引量:32
  • 10李斌,漆泰岳,高波,旷文涛.新意法(岩土控制变形工法)概述[J].公路隧道,2009(2):1-4. 被引量:18

共引文献36

同被引文献41

引证文献7

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部