高原单线双洞隧道斜井快速施工技术 被引量:4

Rapid Construction Technology of Single Line Double-hole Inclined Shaft Tunnel in the Plateau
下载PDF
导出
摘要 影响隧道施工的因素很多,尤其是对于高原单线双洞隧道斜井施工,由于作业面多、交通运输通道狭窄等一些列客观原因,严重制约着隧道施工的正常进行。在施工过程中,斜井和正洞运输通道的完善、合理有效的施工组织、合理的人力物力配置以及合理的机械车辆调配等关键技术对其施工速度至关重要。 There are many factors that may restrict the tunnel construction,especially for the construction of single line double-hole inclined shaft tunnel in the plateau. Due to a series of objective reasons like the multi work surfaces and narrow transportation channel,the normal construction of tunnel is seriously restricted. In the normal construction,the know-how like improvement of transport channel for the inclined shaft and the main tunnel,reasonable and effective construction organization,rational allocation of manpower and material resources and reasonable deployment of mechanical vehicles are essential to the construction speed.
出处 《铁道建筑技术》 2015年第8期37-42,共6页 Railway Construction Technology
基金 铁道部科技研究开发计划项目(2008G030-E)
关键词 单线双洞 运输通道 施工组织 人力物力 调配 快速 single line double-hole transportation channel construction organization manpower and material resources deployment rapidness
  • 相关文献

参考文献1

二级参考文献3

共引文献18

同被引文献40

引证文献4

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部