摘要 强制归心墩在控制测量中广泛应用,具有良好的稳定性,可有效减少仪器对中误差,增加测量精度。在隧道未全断面贯通且工期紧张时,采用临时强制归心墩提前进行CPⅡ控制网布设,对节约工期时间具有重大意义。 With a good stability,mandatory centering piers are widely used in the control survey,which can effectively reduce the error in the instrument and increase the accuracy of measurement. When the whole section of the tunnel is not running-through and the duration is limited,advanced laying out of CPⅡ control network with temporary mandatory centering pier is of great significance for duration saving.
出处 《铁道建筑技术》 2015年第9期86-89,共4页 Railway Construction Technology
关键词 强制归心墩 隧道 CPⅡ控制网 mandatory centering pier tunnel CPⅡ control network
  • 相关文献

参考文献6

二级参考文献16

  • 1黄立人.测距网中两个方差因子的估计[J].地壳形变与地震,1989,9(1):46-51. 被引量:5
  • 2成英燕,程鹏飞,顾旦生,张莉,秘金钟,郭春喜,庞尚益.联合平差中的方差分量估计问题的探讨[J].测绘科学,2005,30(2):55-56. 被引量:10
  • 3于正林 鲁林成.测量平差基础[M].北京:测绘出版社,1983..
  • 4铁建设[2006] 189号,客运专线无砟轨道铁路工程测量暂行规定[S].
  • 5铁建设[2007] 47号,新建时速度300 km~350 km客运专线铁路设计暂行规定(下)[S].
  • 6铁建设[2007] 47号,新建时速度300 km~350 km客运专线铁路设计暂行规定(上)[S].
  • 7GB12897-91.国家一、二等水准测量规范[S].[S].,..
  • 8TB10101-99.新建铁路工程测量规范[S].[S].,..
  • 9於宗俦 鲁林成.测量平差基础[M].北京:测绘出版社,1978..
  • 10谭建荣.图学基础教程[M].北京:高等教育出版社,2001..

共引文献30

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部