长春地铁2号线袁家店车站是国内首座预制装配式地铁车站,通过对本工程施工方法的深入研究,解决了拼装形式、合理步序、构件吊运、定位纠偏及拼装装备研制等6项技术难题,为类似工程施工提供参考。
The Yuanjiadian Station of Changchun Metro Line 2 is the first prefabricated subway station in China. According to the comprehensive investigation on this project,some construction difficulties are basically solved such as assembling forms,reasonable steps,component lifting,positioning deviation and development of assembling equipment. It can provide a reference for similar projects.