株洲铁路综合物流园疏解方案研究 被引量:1

Research on the Linking Plan of Zhuzhou Railway Integrated Logistics Park
下载PDF
导出
摘要 为解决株洲铁路综合物流园远期新增货流切割京广、沪昆客运正线的问题,阐述株洲铁路综合物流园现状,研究提出接轨下行系统南环线方案、接轨下行系统Ⅲ场方案、接轨上行系统小运转联络线方案、接轨上行系统VI场方案、正线抬道方案5种疏解方案。考虑满足运输需求、既有线影响、施工难度、工程投资等多方面因素,经综合比选,推荐线路坡度最小、工程投资最省的接轨上行系统小运转联络线方案,对新建大型铁路物流园接入区域性编组站、修建疏解线提供参考。 In order to solve the problem of the new freight flow on account of Zhuzhou railway integrated logistics park connecting to Beijing-Guangzhou railway and Shanghai-Kunming railway, after the overview of Zhuzhou railway integrated logistics park, the paper provides five alternative plans of linking lines: linking the south loop line of the down system, the III yard of the down system, the transfer contact line of the up-line system, the VI yard of the up-line system, lifting the main line. By comprehensive comparisons and considering the transportation demand, the influence on existing line, construction difficulty, project investment and other factors, it recommends the transfer contact line of the up-line system with the smallest slope and the minimum investment, which can provide the beneficial reference for new large-scale railway logistics park connecting to the regional marshalling yard and constructing linking lines.
作者 陶荣阳
出处 《铁道运输与经济》 北大核心 2017年第S2期7-13,共7页 Railway Transport and Economy
基金 中铁上海设计院集团有限公司科研课题(QS2014009)
关键词 株洲铁路物流园 株洲北站 疏解方案 能力利用率分析 方案比选 Zhuzhou Railway Logistics Park Zhuzhou North Station Linking Plan Analysis of Capacity Utilization Plan Comparison
  • 相关文献

参考文献4

二级参考文献20

共引文献29

同被引文献6

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部