介绍桩基主动托换加固和盖梁加固的主要设计构思、施工工艺流程及施工监控的主要内容。
This article introduces the design considerations for pile foundation reinforcement by active underpinning and pier coping reinforcement, and the corresponding construction technological flow and construction monitoring.