针对辽宁大成 (大连 )肉鸡加工厂屠宰废水水质特点 ,将原有的混凝沉淀改建为混凝气浮作为生化处理的预处理工艺。改建后 ,处理水水质达到辽宁省一级排放标准 ,CODCr去除率高于 96 % ,运行成本为 2 0 1元 m3。
According to the characteristics of the slaughter wastewater from Dacheng Chincken Factory in Dalian,Liaoning Proviance,we will rebuild the flocculation sedimentation process into the flocculation air floatation process as preteratment of the bio chemical treatment process.The running results show that the quality of the effluent can meet the requirements for the first order of the discharge standard in Liaoning,the removal ratio of COD Cr can achieve more than 96%,the running cost is 2 01 RMB/Ton