摘要
针对松江河梯级水电站后续工程建设的必要性、技术经济可行性、实行电力市场后竞价上网能力等进行了探讨,对市场经济条件下可能出现的几种典型管理模式所对应的建设组合方案进行了论证,推荐了后续建设方案,并提出建议。
It is submitted the necessity and feasibility of subsequent project of cascade hydropower station in Songjianghe. The development schemes corresponding to some typical management modules are discussed. The scheme of subsequent construction is recommended and the reasonable suggestions are submitted.
出处
《吉林电力》
2003年第5期7-9,52,共4页
Jilin Electric Power